Our future Windsmiths

We have many visitors at the Maple Ridge Wind Farm. Photo courtesy of www.newzjunky.com
Grazing under the wind.

Long view from atop a turbine.

Maple Ridge from afar.

The wind and Old Glory.
Construction began May 2005 and is scheduled to complete in December 2006. More photos are available at www.tughill.org.

May 2005: The concrete batch plant off of Rector Road was constructed to provide the 350 yards of concrete needed for each turbine. A local concrete company was used for Phase II.

Construction off the access roads off of Snyder and Borkowski Roads.

350 yards of concrete was needed for each turbine.

August 2005: First turbine up
Lowering blade to a hub for assembly. Blades are 130 feet long and weigh 7,500 lbs
More blade maneuvering. The blades were made in England and Pennsylvania.

Assembling a rotor.

Raising a rotor

Multiple turbines
|